EUNOIA topFIX universal is a one-component dry type of construction adhesive, made of mineral fillers, additives, hydraulic and synthetic binders, EUNOIA topFIX universal is intended for gluing Styrofoam and Styrodur to all types of mineral substrates, as well as for a reinforced layer on Styrofoam and Styrodur plates.
How to use: The surface on which the glue is applied must be firm, dry, free of grease and without any oil residues or old coatings. EUNOIA topFIX universal is prepared by adding 200-250 g of water to 1 kg of material. Mix the mixture for 3-5 minutes until complete homogenization. Leave the prepared material to stand for approx. 10 minutes, then mix the glue once more, after which it is ready for use. Use the prepared glue within two hours. EUNOIA topFIX universal is applied manually with a steel trowel in the middle and along the edges at an angle of 45 degrees from the outside (glue coverage min. 40%), and gently press the panel on the wall. 2-3 stripes down the middle. Glue must never get between the joints of the panels, because thermal bridges are made in this way. Fill joints up to 2 mm with PU foam for styrofoam and over 2 mm with styrofoam strips. Opening time is about 20 minutes. Place the reinforcing mesh by pressing into the layer of applied EUNOIA topFIX universal adhesive, 2-3 mm thick, with an overlap of 10 cm, and then level the entire surface with Eunoia topFIX universal adhesive. The total thickness of the applied EUNOIA topFIX universal adhesive should be at least 4 mm.
Operating temperature: The optimal operating temperature is from +10°C to +30°C. It must not be used below +5°C, nor in strong sun, wind, fog or rain. In optimal conditions, freshly treated surfaces should be protected from atmospheric influences for at least 24 hours.
Consumption: 4-5 kg/m2 for gluing, depending on the condition of the wall surface;
4-5 kg/m2 for reinforcement.
Shelf life and storage: 12 months from the production date indicated on the packaging. Store in the original, well-closed and undamaged packaging in a dry and ventilated room, according to the conditions prescribed for cement storage.
top of page
€0.00Price
bottom of page